16 MW
Capacity
Operating
Current status
2019
Operating since
1
Generators
19.7%
Capacity factor
28 GWh
Annual generation
Briefing/plantOperating

Two Mile Desert Project is a 16 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

Two Mile Desert Project is reported in North Carolina since 2019 under Citizens Enterprises Corporation. Available operating and financial measures include 19.7% capacity factor and 28 GWh annual generation; $29.1/MWh reported energy value.

Location
Perquimans, North Carolina
Technology
Solar Photovoltaic
Owner / parent
Citizens Enterprises Corporation
Operator
Citizens Enterprises Corporation
Grid
PJM Interconnection
Plant ID
60510

What stands out

1

Two Mile Desert Project is a 16 MW Solar Photovoltaic asset in North Carolina with status Operating.

2

Latest annual operating measures report 19.7% capacity factor and 28 GWh annual generation.

3

Available financial measures include $29.1/MWh energy value.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
State rank
#102 of 782
National rank
#1944 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.