Query
TWIN PALMS SOLAR queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
TWIN PALMS SOLAR
ISO/RTO
isone
Generated
2026-10-14T05:03:53.350Z

Briefing on TWIN PALMS SOLAR

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
576 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2030-07-06
Proposed COD
C14
Queue phase
Briefing/projectactive

TWIN PALMS SOLAR is a 576 MW Solar+Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2030-07-06.

Queue ID
CAISO-2048
Location
Riverside, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Colorado River Substation 230 kV

What stands out

1

TWIN PALMS SOLAR is a 576 MW Solar+Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2030-07-06.

3

Latest linked story: “Fullmark Energy’s 20MW/40MWh California BESS reaches commercial operation” (Energy-Storage.News, 2025-08-25).

Market and operating context

Queue date
2021-04-15
Proposed COD
2030-07-06
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

TWIN PALMS SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-2048
LocationRiverside, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionColorado River Substation 230 kV
Queue date2021-04-15
Proposed COD2030-07-06
IA statusIA Executed