Query
Twin Lakes
Type
Entity Briefing
Entity
Twin Lakes
Summary generated
Oct 12, 2026
First saved
Date not recorded

Briefing on Twin Lakes

Entity Briefing

Summary generated Oct 12, 2026 (UTC).

Source dates used by this summary were not recorded.

75 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
18.7%
Capacity factor
123 GWh
Annual generation
Briefing/plantOperating

Twin Lakes is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

Twin Lakes is reported in Florida since 2020 under NextEra Energy. Available operating and financial measures include 18.7% capacity factor and 123 GWh annual generation; $1079/kW reported CapEx.

Location
Putnam, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
62633

What stands out

1

Twin Lakes is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 18.7% capacity factor and 123 GWh annual generation.

3

Available financial measures include $4.0/MWh OpEx, $1079/kW CapEx.

4

Latest linked story: “AI Data Centers Are About to Break the Grid. One Company Just Spent $67 Billion to Fix It” (24/7 Wall St., 2026-05-24).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#135 of 237
National rank
#1166 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.