TWE Bowman Solar Project is a 75 MW Solar Photovoltaic asset in South Carolina, currently Operating.
TWE Bowman Solar Project is reported in South Carolina since 2020 under Enel. Available operating and financial measures include 21.9% capacity factor and 144 GWh annual generation; $29.1/MWh reported energy value.
- Location
- Orangeburg, South Carolina
- Technology
- Solar Photovoltaic
- Owner / parent
- Enel
- Operator
- SunStrong Management
- Grid
- Dominion Energy South Carolina
- Plant ID
- 62828
What stands out
TWE Bowman Solar Project is a 75 MW Solar Photovoltaic asset in South Carolina with status Operating.
Latest annual operating measures report 21.9% capacity factor and 144 GWh annual generation.
Available financial measures include $29.1/MWh energy value.
Market and operating context
- Balancing authority
- Dominion Energy South Carolina
- NERC region
- SERC
- State rank
- #11 of 146
- National rank
- #1049 of 7,971
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.