Query
TWC
Type
Entity Briefing
Entity
TWC
Generated
2026-10-10T12:52:23.759Z

Briefing on TWC

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
8.7%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

TWC is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

TWC is reported in California since 2024 under Bravo REC Management LLC. Available operating and financial measures include 8.7% capacity factor and 1 GWh annual generation; $1544/kW reported CapEx.

Location
Tulare, California
Technology
Solar Photovoltaic
Owner / parent
Bravo REC Management LLC
Operator
Bravo REC Management LLC
Grid
CAISO (California)
Plant ID
67863

What stands out

1

TWC is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 8.7% capacity factor and 1 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#833 of 992
National rank
#7047 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.