Query
TWC
Type
Entity Briefing
Entity
TWC
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on TWC

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
8.7%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

TWC is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

TWC is reported in California since 2024 under Bravo REC Management LLC. Available operating and financial measures include 8.7% capacity factor and 1 GWh annual generation; $1544/kW reported CapEx.

Location
Tulare, California
Technology
Solar Photovoltaic
Owner / parent
Bravo REC Management LLC
Operator
Bravo REC Management LLC
Grid
CAISO (California)
Plant ID
67863

What stands out

1

TWC is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 8.7% capacity factor and 1 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#833 of 992
National rank
#7047 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.