Query
Turtle Rock Storage
Type
Entity Briefing
Entity
Turtle Rock Storage
Generated
2026-10-19T07:43:50.210Z

Briefing on Turtle Rock Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
136 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-07-02
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Turtle Rock Storage is a 136 MW Battery project in Texas, currently active.

Turtle Rock Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-02.

Queue ID
ERCOT-28INR0080
Location
Freestone, Texas
Technology
Battery
Developer
Turtle Rock Energy Center, LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV 13501 Clayhill to 13681 Reed

What stands out

1

Turtle Rock Storage is a 136 MW Battery project in Texas with status active.

2

Turtle Rock Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-02.

Market and operating context

Queue date
2024-05-09
Proposed COD
2028-07-02
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Turtle Rock Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0080
LocationFreestone, Texas
TechnologyBattery
DeveloperTurtle Rock Energy Center, LLC
Market / regionERCOT
Point of interconnectionTap 138 kV 13501 Clayhill to 13681 Reed
Queue date2024-05-09
Proposed COD2028-07-02