Query
Turquoise Liberty Solar
Type
Entity Briefing
Entity
Turquoise Liberty Solar
Summary generated
Oct 12, 2026
First saved
Date not recorded

Briefing on Turquoise Liberty Solar

Entity Briefing

Summary generated Oct 12, 2026 (UTC).

Source dates used by this summary were not recorded.

10 MW
Capacity
Operating
Current status
2019
Operating since
1
Generators
10.5%
Capacity factor
9 GWh
Annual generation
Briefing/plantOperating

Turquoise Liberty Solar is a 10 MW Solar Photovoltaic asset in Nevada, currently Operating.

Turquoise Liberty Solar is reported in Nevada since 2019 under Liberty Utilities (CalPeco Electric) LLC. Available operating and financial measures include 10.5% capacity factor and 9 GWh annual generation; $20.8/MWh reported energy value.

Location
Washoe, Nevada
Technology
Solar Photovoltaic
Owner / parent
Liberty Utilities (CalPeco Electric) LLC
Operator
Liberty Utilities (CalPeco Electric) LLC
Grid
Nevada Power Company
Plant ID
62980

What stands out

1

Turquoise Liberty Solar is a 10 MW Solar Photovoltaic asset in Nevada with status Operating.

2

Latest annual operating measures report 10.5% capacity factor and 9 GWh annual generation.

3

Available financial measures include $20.8/MWh energy value.

4

Latest linked story: “Northern Nevada's Largest Solar Project Set to Power-Up” (KTVN, 2022-04-06).

Market and operating context

Balancing authority
Nevada Power Company
NERC region
WECC
State rank
#50 of 62
National rank
#2187 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.