Query
Turnpike
Type
Entity Briefing
Entity
Turnpike
Generated
2026-10-17T21:57:07.420Z

Briefing on Turnpike

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
75 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
26.2%
Capacity factor
171 GWh
Annual generation
Briefing/plantOperating

Turnpike is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

Turnpike is reported in Florida since 2024 under NextEra Energy. Available operating and financial measures include 26.2% capacity factor and 171 GWh annual generation; $1425/kW reported CapEx.

Location
Indian River, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
65873

What stands out

1

Turnpike is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 26.2% capacity factor and 171 GWh annual generation.

3

Available financial measures include $0.4/MWh OpEx, $1425/kW CapEx.

4

Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#63 of 237
National rank
#1193 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.