Query
Turner Meadow Solar
Type
Entity Briefing
Entity
Turner Meadow Solar
Generated
2026-10-19T12:19:02.319Z

Briefing on Turner Meadow Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
20 MW
Proposed capacity
active
Current status
Solar
Technology
ISO-NE
Market / region
2026-11-20
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Turner Meadow Solar is a 20 MW Solar project in Maine, currently active.

The reported queue phase is IA Executed. Proposed COD is 2026-11-20.

Queue ID
ISO-NE-1139
Location
Androscoggin, Maine
Technology
Solar
Market / region
ISO-NE
Point of interconnection
CMP 34.5kV Line 50

What stands out

1

Turner Meadow Solar is a 20 MW Solar project in Maine with status active.

2

The reported queue phase is IA Executed; proposed COD is 2026-11-20.

Market and operating context

Queue date
2021-06-04
Proposed COD
2026-11-20
IA status
IA Executed
Study phase
IA Executed
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Turner Meadow Solar — verified asset snapshot

FieldValue
Queue IDISO-NE-1139
LocationAndroscoggin, Maine
TechnologySolar
Market / regionISO-NE
Point of interconnectionCMP 34.5kV Line 50
Queue date2021-06-04
Proposed COD2026-11-20
IA statusIA Executed