Query
Tunnel
Type
Entity Briefing
Entity
Tunnel
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Tunnel

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

21 MW
Capacity
Operating
Current status
1919
Operating since
3
Generators
4.3%
Capacity factor
8 GWh
Annual generation
Briefing/plantOperating

Tunnel is a 21 MW Conventional Hydroelectric asset in ISO New England, currently Operating.

Tunnel is reported in Connecticut since 1919 under FirstLight Power Resources Services LLC. Available operating and financial measures include 4.3% capacity factor and 8 GWh annual generation; $2294/kW reported CapEx.

Location
New London, Connecticut
Technology
Conventional Hydroelectric, Petroleum Liquids
Owner / parent
FirstLight Power Resources Services LLC
Operator
FirstLight Power Resources Services LLC
Grid
ISO New England
Plant ID
557

What stands out

1

Tunnel is a 21 MW Conventional Hydroelectric asset in Connecticut with status Operating.

2

Latest annual operating measures report 4.3% capacity factor and 8 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Fishheart begins US fish passage project in Connecticut” (International Water Power, 2025-05-13).

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#1 of 1
National rank
#3 of 5

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.