Tunnel is a 21 MW Conventional Hydroelectric asset in ISO New England, currently Operating.
Tunnel is reported in Connecticut since 1919 under FirstLight Power Resources Services LLC. Available operating and financial measures include 4.3% capacity factor and 8 GWh annual generation; $2294/kW reported CapEx.
- Location
- New London, Connecticut
- Technology
- Conventional Hydroelectric, Petroleum Liquids
- Owner / parent
- FirstLight Power Resources Services LLC
- Operator
- FirstLight Power Resources Services LLC
- Grid
- ISO New England
- Plant ID
- 557
What stands out
Tunnel is a 21 MW Conventional Hydroelectric asset in Connecticut with status Operating.
Latest annual operating measures report 4.3% capacity factor and 8 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Latest linked story: “Fishheart begins US fish passage project in Connecticut” (International Water Power, 2025-05-13).
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #1 of 1
- National rank
- #3 of 5
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.