Briefing/projectactive
TULE WIND is a 259 MW Wind+Battery project in California, currently active.
The reported queue phase is IA Executed. Proposed COD is 2030-10-31.
- Queue ID
- CAISO-32
- Location
- San Diego, California
- Technology
- Wind+Battery
- Market / region
- CAISO
- Point of interconnection
- Boulevard East Substation 138 kV
What stands out
1
TULE WIND is a 259 MW Wind+Battery project in California with status active.
2
The reported queue phase is IA Executed; proposed COD is 2030-10-31.
3
Latest linked story: “Inside a wind farm producing renewable energy for San Diego County” (cbs8.com, 2022-06-20).
Market and operating context
- Queue date
- 2004-05-24
- Proposed COD
- 2030-10-31
- IA status
- IA Executed
- Study phase
- IA Executed
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.