Tulare Success Power Project is a 1 MW Conventional Hydroelectric asset in CAISO (California), currently Standby.
Tulare Success Power Project is reported in California since 1989 under Lower Tule River Irrgtn Dist. Available operating and financial measures include 13.3% capacity factor and 2 GWh annual generation; $2294/kW reported CapEx.
- Location
- Tulare, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- Lower Tule River Irrgtn Dist
- Operator
- Lower Tule River Irrgtn Dist
- Grid
- CAISO (California)
- Plant ID
- 10222
What stands out
Tulare Success Power Project is a 1 MW Conventional Hydroelectric asset in California with status Standby.
Latest annual operating measures report 13.3% capacity factor and 2 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #230 of 247
- National rank
- #1329 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.