Briefing/projectactive
Trojan Solar SLF is a 151 MW Solar+Battery project in Texas, currently active.
Compadre Solar, is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-03-30.
- Queue ID
- ERCOT-23INR0296
- Location
- Cooke, Texas
- Technology
- Solar+Battery
- Developer
- Compadre Solar,
- Market / region
- ERCOT
- Point of interconnection
- 11735 Cedar Elm Switch 345kV
What stands out
1
Trojan Solar SLF is a 151 MW Solar+Battery project in Texas with status active.
2
Compadre Solar, is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-03-30.
Market and operating context
- Queue date
- 2021-07-01
- Proposed COD
- 2026-03-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.