Briefing on Triple B Solar Alt#2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Triple B Solar Alt#2 is a 150 MW Solar project in Texas, currently active.

Triple B Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-24INR0069
Location
Lampasas, Texas
Technology
Solar
Developer
Triple B Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 7066 Adamsville - 7064 Lampasas

What stands out

1

Triple B Solar Alt#2 is a 150 MW Solar project in Texas with status active.

2

Triple B Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

4

Latest linked story: “Texas will host the largest solar project in the US” (Electrek, 2020-11-20).

Market and operating context

Queue date
2021-06-10
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Triple B Solar Alt#2 — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0069
LocationLampasas, Texas
TechnologySolar
DeveloperTriple B Solar LLC
Market / regionERCOT
Point of interconnectionTap 138kV 7066 Adamsville - 7064 Lampasas
Queue date2021-06-10
Proposed COD2028-07-01