Briefing on Trinity Hills BESS SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
94 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-01-24
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Trinity Hills BESS SLF is a 94 MW Battery project in Texas, currently active.

Phoenix Battery Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-24.

Queue ID
ERCOT-26INR0295
Location
Archer, Texas
Technology
Battery
Developer
Phoenix Battery Storage, LLC
Market / region
ERCOT
Point of interconnection
To the 345 kV Garvey Road Switch (#17002)

What stands out

1

Trinity Hills BESS SLF is a 94 MW Battery project in Texas with status active.

2

Phoenix Battery Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-24.

Market and operating context

Queue date
2023-11-30
Proposed COD
2028-01-24
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Trinity Hills BESS SLF — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0295
LocationArcher, Texas
TechnologyBattery
DeveloperPhoenix Battery Storage, LLC
Market / regionERCOT
Point of interconnectionTo the 345 kV Garvey Road Switch (#17002)
Queue date2023-11-30
Proposed COD2028-01-24