Briefing/projectactive
Trinity Hills BESS SLF is a 94 MW Battery project in Texas, currently active.
Phoenix Battery Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-24.
- Queue ID
- ERCOT-26INR0295
- Location
- Archer, Texas
- Technology
- Battery
- Developer
- Phoenix Battery Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- To the 345 kV Garvey Road Switch (#17002)
What stands out
1
Trinity Hills BESS SLF is a 94 MW Battery project in Texas with status active.
2
Phoenix Battery Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-01-24.
Market and operating context
- Queue date
- 2023-11-30
- Proposed COD
- 2028-01-24
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.