Tri-County Water Hydropower Project is a 8 MW Conventional Hydroelectric asset in Colorado, currently Operating.
Tri-County Water Hydropower Project is reported in Colorado since 2014 under Tri-County Water Conservancy District. Available operating and financial measures include 23.4% capacity factor and 16 GWh annual generation; $1221/kW reported CapEx.
- Location
- Ouray, Colorado
- Technology
- Conventional Hydroelectric
- Owner / parent
- Tri-County Water Conservancy District
- Operator
- Tri-County Water Conservancy District
- Grid
- Western Area Power Administration - Rocky Mountain Region
- Plant ID
- 58901
What stands out
Tri-County Water Hydropower Project is a 8 MW Conventional Hydroelectric asset in Colorado with status Operating.
Latest annual operating measures report 23.4% capacity factor and 16 GWh annual generation.
Available financial measures include $1221/kW CapEx.
Market and operating context
- Balancing authority
- Western Area Power Administration - Rocky Mountain Region
- NERC region
- WECC
- State rank
- #16 of 49
- National rank
- #731 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.