Query
Trenton West Phase 2
Type
Entity Briefing
Entity
Trenton West Phase 2
ISO/RTO
spp
Generated
2026-10-18T11:04:10.608Z

Briefing on Trenton West Phase 2

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Trenton West Phase 2 is a 2 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Trenton West Phase 2 is reported in Illinois since 2025 under Generate Capital. Available operating and financial measures include $1606/kW reported CapEx.

Location
Clinton, Illinois
Technology
Solar Photovoltaic
Owner / parent
Generate Capital
Operator
Generate Capital
Grid
MISO (Midcontinent)
Plant ID
69599

What stands out

1

Trenton West Phase 2 is a 2 MW Solar Photovoltaic asset in Illinois with status Operating.

2

Available financial measures include $1606/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
State rank
#229 of 462
National rank
#5893 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Trenton West Phase 2 — verified asset snapshot

FieldValue
LocationClinton, Illinois
TechnologySolar Photovoltaic
Owner / parentGenerate Capital
OperatorGenerate Capital
GridMISO (Midcontinent)
Plant ID69599
ISO / marketMISO (Midcontinent)
State rank#229 of 462