220 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Trenton Channel Energy Center is a 220 MW Batteries asset in MISO (Midcontinent), currently Under construction.

Trenton Channel Energy Center is reported in Michigan under DTE Energy. Available operating and financial measures include $1361/kW reported CapEx.

Location
Wayne, Michigan
Technology
Batteries
Owner / parent
DTE Energy
Operator
DTE Electric Company
Grid
MISO (Midcontinent)
Plant ID
67759

What stands out

1

Trenton Channel Energy Center is a 220 MW Batteries asset in Michigan with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “LG ES system integrator subsidiary signs 6GWh BESS deal with Michigan utility DTE Energy” (Energy Storage News, 2026-05-28).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#1 of 5
National rank
#145 of 994

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Trenton Channel Energy Center — verified asset snapshot

FieldValue
LocationWayne, Michigan
TechnologyBatteries
Owner / parentDTE Energy
OperatorDTE Electric Company
GridMISO (Midcontinent)
Plant ID67759
ISO / marketMISO (Midcontinent)