Query
Trenton Channel Energy Center
Type
Entity Briefing
Entity
Trenton Channel Energy Center
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Trenton Channel Energy Center

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

220 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Trenton Channel Energy Center is a 220 MW Batteries asset in MISO (Midcontinent), currently Under construction.

Trenton Channel Energy Center is reported in Michigan under DTE Energy. Available operating and financial measures include $1361/kW reported CapEx.

Location
Wayne, Michigan
Technology
Batteries
Owner / parent
DTE Energy
Operator
DTE Electric Company
Grid
MISO (Midcontinent)
Plant ID
67759

What stands out

1

Trenton Channel Energy Center is a 220 MW Batteries asset in Michigan with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “LG ES system integrator subsidiary signs 6GWh BESS deal with Michigan utility DTE Energy” (Energy Storage News, 2026-05-28).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#1 of 5
National rank
#145 of 994

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Trenton Channel Energy Center — verified asset snapshot

FieldValue
LocationWayne, Michigan
TechnologyBatteries
Owner / parentDTE Energy
OperatorDTE Electric Company
GridMISO (Midcontinent)
Plant ID67759
ISO / marketMISO (Midcontinent)
Balancing authorityMidcontinent Independent Transmission System Operator, Inc..