Briefing on Trailblazer BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
262 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-12
Proposed COD
Briefing/projectactive

Trailblazer BESS is a 262 MW Battery project in Texas, currently active.

Trailblazer Infrastructure LLC is the reported developer. Proposed COD is 2027-12-12.

Queue ID
ERCOT-27INR0576
Location
Nolan, Texas
Technology
Battery
Developer
Trailblazer Infrastructure LLC
Market / region
ERCOT
Point of interconnection
11420 Sweetwater East Switch 345 kV

What stands out

1

Trailblazer BESS is a 262 MW Battery project in Texas with status active.

2

Trailblazer Infrastructure LLC is the reported developer.

3

proposed COD is 2027-12-12.

Market and operating context

Queue date
2026-03-18
Proposed COD
2027-12-12

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Trailblazer BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0576
LocationNolan, Texas
TechnologyBattery
DeveloperTrailblazer Infrastructure LLC
Market / regionERCOT
Point of interconnection11420 Sweetwater East Switch 345 kV
Queue date2026-03-18
Proposed COD2027-12-12