Query
Toyota HQ Plan
Type
Entity Briefing
Entity
Toyota HQ Plan
State
MD
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Toyota HQ Plan

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

8 MW
Capacity
Operating
Current status
2017
Operating since
1
Generators
9.9%
Capacity factor
7 GWh
Annual generation
Briefing/plantOperating

Toyota HQ Plan is a 8 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Toyota HQ Plan is reported in Texas since 2017 under MN8 Energy LLC. Available operating and financial measures include 9.9% capacity factor and 7 GWh annual generation; $22.2/MWh reported energy value.

Location
Collin, Texas
Technology
Solar Photovoltaic
Owner / parent
MN8 Energy LLC
Operator
MN8 Energy LLC
Grid
ERCOT (Texas)
Plant ID
61895

What stands out

1

Toyota HQ Plan is a 8 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 9.9% capacity factor and 7 GWh annual generation.

3

Available financial measures include $22.2/MWh energy value.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#333 of 378
National rank
#2382 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.