Query
TOCE GA 1 Solar
Type
Entity Briefing
Entity
TOCE GA 1 Solar
State
GA
Technology
solar
Generated
2026-10-06T15:03:56.916Z

Briefing on TOCE GA 1 Solar

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
125 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2026-09-01
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

TOCE GA 1 Solar is a 125 MW Solar project in Georgia, currently active.

The reported queue phase is System Impact Study. Proposed COD is 2026-09-01.

Queue ID
GTC-GI-177
Location
Burke, Georgia
Technology
Solar
Market / region
Southeast
Point of interconnection
Greens Cut - Greens Cut Junction 115 kV Tap

What stands out

1

TOCE GA 1 Solar is a 125 MW Solar project in Georgia with status active.

2

The reported queue phase is System Impact Study; proposed COD is 2026-09-01.

3

Latest linked story: “A new Georgia data center could be powered by RICE. It’s not the kind you eat.” (AJC.com, 2025-12-19).

Market and operating context

Queue date
2023-08-03
Proposed COD
2026-09-01
IA status
System Impact Study
Study phase
System Impact Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

TOCE GA 1 Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-177
LocationBurke, Georgia
TechnologySolar
Market / regionSoutheast
Point of interconnectionGreens Cut - Greens Cut Junction 115 kV Tap
Queue date2023-08-03
Proposed COD2026-09-01
IA statusSystem Impact Study