Tipperary Solar is a 60 MW Solar project in Texas, currently active.
Tippsol is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-15.
- Queue ID
- ERCOT-27INR0261
- Location
- Schleicher, Texas
- Technology
- Solar
- Developer
- Tippsol
- Market / region
- ERCOT
- Point of interconnection
- 6498 Live Oak AEP 69kV
What stands out
1
Tipperary Solar is a 60 MW Solar project in Texas with status active.
2
Tippsol is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-03-15.
Market and operating context
- Queue date
- 2024-06-13
- Proposed COD
- 2028-03-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.