Query
Tieton Dam Hydro Electric Project
Type
Entity Briefing
Entity
Tieton Dam Hydro Electric Project
Technology
hydro
Generated
2026-10-17T09:37:39.932Z

Briefing on Tieton Dam Hydro Electric Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
14 MW
Capacity
Operating
Current status
2006
Operating since
2
Generators
14.7%
Capacity factor
18 GWh
Annual generation
Briefing/plantOperating

Tieton Dam Hydro Electric Project is a 14 MW Conventional Hydroelectric asset in Washington, currently Operating.

Tieton Dam Hydro Electric Project is reported in Washington since 2006 under City of Burbank Water and Power - (CA). Available operating and financial measures include 14.7% capacity factor and 18 GWh annual generation; $2294/kW reported CapEx.

Location
Yakima, Washington
Technology
Conventional Hydroelectric
Owner / parent
City of Burbank Water and Power - (CA)
Operator
City of Burbank Water and Power - (CA)
Grid
PacifiCorp - West
Plant ID
57496

What stands out

1

Tieton Dam Hydro Electric Project is a 14 MW Conventional Hydroelectric asset in Washington with status Operating.

2

Latest annual operating measures report 14.7% capacity factor and 18 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Opinion: Century-old Tieton Dam stands as a testament to our potential” (Yakima Herald-Republic, 2025-08-16).

Market and operating context

Balancing authority
PacifiCorp - West
NERC region
WECC
State rank
#45 of 73
National rank
#569 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.