Tieton Dam Hydro Electric Project is a 14 MW Conventional Hydroelectric asset in Washington, currently Operating.
Tieton Dam Hydro Electric Project is reported in Washington since 2006 under City of Burbank Water and Power - (CA). Available operating and financial measures include 14.7% capacity factor and 18 GWh annual generation; $2294/kW reported CapEx.
- Location
- Yakima, Washington
- Technology
- Conventional Hydroelectric
- Owner / parent
- City of Burbank Water and Power - (CA)
- Operator
- City of Burbank Water and Power - (CA)
- Grid
- PacifiCorp - West
- Plant ID
- 57496
What stands out
Tieton Dam Hydro Electric Project is a 14 MW Conventional Hydroelectric asset in Washington with status Operating.
Latest annual operating measures report 14.7% capacity factor and 18 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Latest linked story: “Opinion: Century-old Tieton Dam stands as a testament to our potential” (Yakima Herald-Republic, 2025-08-16).
Market and operating context
- Balancing authority
- PacifiCorp - West
- NERC region
- WECC
- State rank
- #45 of 73
- National rank
- #569 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.