Query
Thunderbird Valley Storage
Type
Entity Briefing
Entity
Thunderbird Valley Storage
Technology
battery
Generated
2026-10-19T16:39:41.132Z

Briefing on Thunderbird Valley Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Thunderbird Valley Storage is a 150 MW Battery project in Texas, currently active.

Thunderbird Valley Storage is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-27INR0326
Location
Young, Texas
Technology
Battery
Developer
Thunderbird Valley Storage
Market / region
ERCOT
Point of interconnection
(787) Olney Substation 138 kV

What stands out

1

Thunderbird Valley Storage is a 150 MW Battery project in Texas with status active.

2

Thunderbird Valley Storage is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2024-11-19
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Thunderbird Valley Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0326
LocationYoung, Texas
TechnologyBattery
DeveloperThunderbird Valley Storage
Market / regionERCOT
Point of interconnection(787) Olney Substation 138 kV
Queue date2024-11-19
Proposed COD2028-07-01