Briefing/projectactive
Thunderbird Valley Storage is a 150 MW Battery project in Texas, currently active.
Thunderbird Valley Storage is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-27INR0326
- Location
- Young, Texas
- Technology
- Battery
- Developer
- Thunderbird Valley Storage
- Market / region
- ERCOT
- Point of interconnection
- (787) Olney Substation 138 kV
What stands out
1
Thunderbird Valley Storage is a 150 MW Battery project in Texas with status active.
2
Thunderbird Valley Storage is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-07-01.
Market and operating context
- Queue date
- 2024-11-19
- Proposed COD
- 2028-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.