Briefing/projectactive
Three Ranches Solar is a 126 MW Solar+Battery project in Texas, currently active.
Three Ranches Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.
- Queue ID
- ERCOT-28INR0271
- Location
- Brewster, Texas
- Technology
- Solar+Battery
- Developer
- Three Ranches Energy LLC
- Market / region
- ERCOT
- Point of interconnection
- TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch
What stands out
1
Three Ranches Solar is a 126 MW Solar+Battery project in Texas with status active.
2
Three Ranches Energy LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-01.
Market and operating context
- Queue date
- 2025-02-14
- Proposed COD
- 2029-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.