Briefing/projectactive
Three Lakes Solar is a 300 MW Solar+Battery project in Michigan, currently active.
Three Lakes Solar LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2022-10-31.
- Queue ID
- PJM-AF1-176
- Location
- St. Joseph, Michigan
- Technology
- Solar+Battery
- Developer
- Three Lakes Solar LLC
- Market / region
- PJM
- Point of interconnection
- Corey 138 kV
What stands out
1
Three Lakes Solar is a 300 MW Solar+Battery project in Michigan with status active.
2
Three Lakes Solar LLC is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2022-10-31.
Market and operating context
- Queue date
- 2019-09-25
- Proposed COD
- 2022-10-31
- IA status
- System Impact Study
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.