Query
Three Bridge
Type
Entity Briefing
Entity
Three Bridge
Generated
2026-10-17T15:37:27.249Z

Briefing on Three Bridge

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
18.4%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Three Bridge is a 2 MW Solar Photovoltaic asset in North Carolina, currently Operating.

Three Bridge is reported in North Carolina since 2018 under SunStrong Management. Available operating and financial measures include 18.4% capacity factor and 3 GWh annual generation; $20.6/MWh reported energy value.

Location
Robeson, North Carolina
Technology
Solar Photovoltaic
Owner / parent
SunStrong Management
Operator
SunStrong Management
Grid
Duke Energy Progress East
Plant ID
62540

What stands out

1

Three Bridge is a 2 MW Solar Photovoltaic asset in North Carolina with status Operating.

2

Latest annual operating measures report 18.4% capacity factor and 3 GWh annual generation.

3

Available financial measures include $20.6/MWh energy value.

Market and operating context

Balancing authority
Duke Energy Progress East
NERC region
SERC
State rank
#688 of 782
National rank
#5521 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.