Query
Thermo Fisher Pleasanton
Type
Entity Briefing
Entity
Thermo Fisher Pleasanton
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on Thermo Fisher Pleasanton

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

3 MW
Capacity
Operating
Current status
2025
Operating since
2
Generators
Briefing/plantOperating

Thermo Fisher Pleasanton is a 3 MW Batteries asset in CAISO (California), currently Operating.

Thermo Fisher Pleasanton is reported in California since 2025 under TotalEnergies Renewables USA LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Alameda, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
TotalEnergies Renewables USA LLC
Operator
TotalEnergies Renewables USA LLC
Grid
CAISO (California)
Plant ID
68997

What stands out

1

Thermo Fisher Pleasanton is a 3 MW Batteries asset in California with status Operating.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#551 of 992
National rank
#4896 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Thermo Fisher Pleasanton — verified asset snapshot

FieldValue
LocationAlameda, California
TechnologyBatteries, Solar Photovoltaic
Owner / parentTotalEnergies Renewables USA LLC
OperatorTotalEnergies Renewables USA LLC
GridCAISO (California)
Plant ID68997
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator