Thermalito Diverson Dam is a 3 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.
Thermalito Diverson Dam is reported in California since 1987 under California Dept. of Water Resources. Available operating and financial measures include 64.5% capacity factor and 19 GWh annual generation; $2294/kW reported CapEx.
- Location
- Butte, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- California Dept. of Water Resources
- Operator
- California Dept. of Water Resources
- Grid
- CAISO (California)
- Plant ID
- 7129
What stands out
Thermalito Diverson Dam is a 3 MW Conventional Hydroelectric asset in California with status Operating.
Latest annual operating measures report 64.5% capacity factor and 19 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #185 of 247
- National rank
- #1020 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.