Briefing on Themisto Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
301 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Themisto Solar is a 301 MW Solar project in Texas, currently active.

Themisto Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.

Queue ID
ERCOT-27INR0218
Location
Nolan, Texas
Technology
Solar
Developer
Themisto Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV Champion Creek #1414 – Sweetwater East #11420

What stands out

1

Themisto Solar is a 301 MW Solar project in Texas with status active.

2

Themisto Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-30.

Market and operating context

Queue date
2024-02-26
Proposed COD
2028-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Themisto Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0218
LocationNolan, Texas
TechnologySolar
DeveloperThemisto Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV Champion Creek #1414 – Sweetwater East #11420
Queue date2024-02-26
Proposed COD2028-06-30