TG East is a 336 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
TG East is reported in Texas since 2022 under TG East Wind Project LLC. Available operating and financial measures include 33.3% capacity factor and 981 GWh annual generation; $1395/kW reported CapEx.
- Location
- Knox, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- TG East Wind Project LLC
- Operator
- TG East Wind Project LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 64639
What stands out
TG East is a 336 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 33.3% capacity factor and 981 GWh annual generation.
Available financial measures include $1395/kW CapEx.
Latest linked story: “Senvion signs conditional contract for 275 MW of wind in the U.S.” (Windpower Engineering & Development, 2018-08-21).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #19 of 252
- National rank
- #67 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.