Query
TG East
Type
Entity Briefing
Entity
TG East
Generated
2026-10-18T02:10:37.577Z

Briefing on TG East

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
336 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
33.3%
Capacity factor
981 GWh
Annual generation
Briefing/plantOperating

TG East is a 336 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

TG East is reported in Texas since 2022 under TG East Wind Project LLC. Available operating and financial measures include 33.3% capacity factor and 981 GWh annual generation; $1395/kW reported CapEx.

Location
Knox, Texas
Technology
Onshore Wind Turbine
Owner / parent
TG East Wind Project LLC
Operator
TG East Wind Project LLC
Grid
ERCOT (Texas)
Plant ID
64639

What stands out

1

TG East is a 336 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 33.3% capacity factor and 981 GWh annual generation.

3

Available financial measures include $1395/kW CapEx.

4

Latest linked story: “Senvion signs conditional contract for 275 MW of wind in the U.S.” (Windpower Engineering & Development, 2018-08-21).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#19 of 252
National rank
#67 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.