Query
Texas Sun Solar
Type
Entity Briefing
Entity
Texas Sun Solar
ISO/RTO
ercot
Technology
solar
Generated
2026-10-19T23:32:43.168Z

Briefing on Texas Sun Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
72 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-12-18
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Texas Sun Solar is a 72 MW Solar project in Texas, currently active.

Pigg Grounds LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-18.

Queue ID
ERCOT-27INR0554
Location
Jackson, Texas
Technology
Solar
Developer
Pigg Grounds LLC
Market / region
ERCOT
Point of interconnection
Cordele Substation ; Bus no. 5524

What stands out

1

Texas Sun Solar is a 72 MW Solar project in Texas with status active.

2

Pigg Grounds LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-18.

4

Latest linked story: “Longroad Energy Achieves Financial Close of 1000 Mile Solar, a 400 MWdc Project” (PR Newswire, 2025-09-15).

Market and operating context

Queue date
2025-09-22
Proposed COD
2027-12-18
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Texas Sun Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0554
LocationJackson, Texas
TechnologySolar
DeveloperPigg Grounds LLC
Market / regionERCOT
Point of interconnectionCordele Substation ; Bus no. 5524
Queue date2025-09-22
Proposed COD2027-12-18