Briefing on TEXAS SOLAR NOVA 3

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-01-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

TEXAS SOLAR NOVA 3 is a 200 MW Solar project in Texas, currently active.

Clearway Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-01-31.

Queue ID
ERCOT-22INR0215
Location
Kent, Texas
Technology
Solar
Developer
Clearway Energy
Market / region
ERCOT
Point of interconnection
tap 345kV 11305 Dermott - 59904 Cottonwood

What stands out

1

TEXAS SOLAR NOVA 3 is a 200 MW Solar project in Texas with status active.

2

Clearway Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-01-31.

Market and operating context

Queue date
2019-06-24
Proposed COD
2026-01-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

TEXAS SOLAR NOVA 3 — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0215
LocationKent, Texas
TechnologySolar
DeveloperClearway Energy
Market / regionERCOT
Point of interconnectiontap 345kV 11305 Dermott - 59904 Cottonwood
Queue date2019-06-24
Proposed COD2026-01-31