Tesla is a 27 MW Conventional Hydroelectric asset in Colorado, currently Operating.
Tesla is reported in Colorado since 1997 under City of Colorado Springs - (CO). Available operating and financial measures include 26.7% capacity factor and 62 GWh annual generation; $2294/kW reported CapEx.
- Location
- El Paso, Colorado
- Technology
- Conventional Hydroelectric
- Owner / parent
- City of Colorado Springs - (CO)
- Operator
- City of Colorado Springs - (CO)
- Grid
- Western Area Power Administration - Rocky Mountain Region
- Plant ID
- 7233
What stands out
Tesla is a 27 MW Conventional Hydroelectric asset in Colorado with status Operating.
Latest annual operating measures report 26.7% capacity factor and 62 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Latest linked story: “Tesla signs PPA for large solar + storage project in Arizona” (Solar Power World, 2026-07-28).
Market and operating context
- Balancing authority
- Western Area Power Administration - Rocky Mountain Region
- NERC region
- WECC
- State rank
- #9 of 49
- National rank
- #428 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.