Terry Bundy Generating Station is a 320 MW Landfill Gas asset in SPP (Southwest Power Pool), currently Operating.
Terry Bundy Generating Station is reported in Nebraska since 2003 under Lincoln Electric System. Available operating and financial measures include 7.2% capacity factor and 136 GWh annual generation; $965/kW reported CapEx.
- Location
- Lancaster, Nebraska
- Technology
- Landfill Gas, Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine, Petroleum Liquids
- Owner / parent
- Lincoln Electric System
- Operator
- Lincoln Electric System
- Grid
- SPP (Southwest Power Pool)
- Plant ID
- 7887
What stands out
Terry Bundy Generating Station is a 320 MW Landfill Gas asset in Nebraska with status Operating.
Latest annual operating measures report 7.2% capacity factor and 136 GWh annual generation.
Available financial measures include $965/kW CapEx.
Latest linked story: “GE Vernova : Lincoln Electric System expands Terry Bundy Plant with GE Vernova gas turbines” (www.marketscreener.com, 2026-02-28).
Market and operating context
- ISO / market
- SPP (Southwest Power Pool)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
- State rank
- #5 of 30
- National rank
- #642 of 2,025
Why it matters
For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.