Briefing/plantOperating
Terry 1818-WD is a 5 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Terry 1818-WD is reported in California since 2024 under Standard Solar. Available operating and financial measures include 0.1% capacity factor and 0 GWh annual generation; $1544/kW reported CapEx.
- Location
- Kern, California
- Technology
- Solar Photovoltaic
- Owner / parent
- Standard Solar
- Operator
- Standard Solar
- Grid
- CAISO (California)
- Plant ID
- 67748
What stands out
1
Terry 1818-WD is a 5 MW Solar Photovoltaic asset in California with status Operating.
2
Latest annual operating measures report 0.1% capacity factor and 0 GWh annual generation.
3
Available financial measures include $1544/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #394 of 992
- National rank
- #3782 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.