Query
Terminus Hydroelectric Project
Type
Entity Briefing
Entity
Terminus Hydroelectric Project
Technology
hydro
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Terminus Hydroelectric Project

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

20 MW
Capacity
Operating
Current status
1990
Operating since
1
Generators
5.7%
Capacity factor
10 GWh
Annual generation
Briefing/plantOperating

Terminus Hydroelectric Project is a 20 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Terminus Hydroelectric Project is reported in California since 1990 under Eagle Creek Renewable Energy, LLC. Available operating and financial measures include 5.7% capacity factor and 10 GWh annual generation; $2294/kW reported CapEx.

Location
Tulare, California
Technology
Conventional Hydroelectric
Owner / parent
Eagle Creek Renewable Energy, LLC
Operator
Eagle Creek Renewable Energy, LLC
Grid
CAISO (California)
Plant ID
54343

What stands out

1

Terminus Hydroelectric Project is a 20 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 5.7% capacity factor and 10 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#93 of 247
National rank
#477 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.