Briefing/plantUnder construction
Tennyson Solar is a 150 MW Solar Photovoltaic asset in ERCOT (Texas), currently Under construction.
Tennyson Solar is reported in Texas under BNB Tennyson Solar LLC. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Coke, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- BNB Tennyson Solar LLC
- Operator
- BNB Tennyson Solar LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 69605
What stands out
1
Tennyson Solar is a 150 MW Solar Photovoltaic asset in Texas with status Under construction.
2
Available financial measures include $1543/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- State rank
- #210 of 378
- National rank
- #581 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.