Briefing/projectactive
Techne BESS is a 203 MW Battery project in Texas, currently active.
Techne BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-31.
- Queue ID
- ERCOT-26INR0514
- Location
- Bastrop, Texas
- Technology
- Battery
- Developer
- Techne BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- 7560 RED ROCK 138kV
What stands out
1
Techne BESS is a 203 MW Battery project in Texas with status active.
2
Techne BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-12-31.
Market and operating context
- Queue date
- 2024-09-10
- Proposed COD
- 2026-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.