Query
Taylor Creek Two
Type
Entity Briefing
Entity
Taylor Creek Two
Generated
2026-10-12T02:57:45.011Z

Briefing on Taylor Creek Two

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
60 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2026-12-01
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

Taylor Creek Two is a 60 MW Solar project in Florida, currently active.

The reported queue phase is System Impact Study. Proposed COD is 2026-12-01.

Queue ID
OUC-202313
Location
Orange, Florida
Technology
Solar
Market / region
Southeast
Point of interconnection
Stanton - Indian River 115 kV

What stands out

1

Taylor Creek Two is a 60 MW Solar project in Florida with status active.

2

The reported queue phase is System Impact Study; proposed COD is 2026-12-01.

Market and operating context

Queue date
2024-02-14
Proposed COD
2026-12-01
IA status
System Impact Study
Study phase
System Impact Study
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Taylor Creek Two — verified asset snapshot

FieldValue
Queue IDOUC-202313
LocationOrange, Florida
TechnologySolar
Market / regionSoutheast
Point of interconnectionStanton - Indian River 115 kV
Queue date2024-02-14
Proposed COD2026-12-01
IA statusSystem Impact Study