Briefing/projectactive
Tavern Energy LLC is a 50 MW Battery project in Virginia, currently active.
Tavern Energy, LLC is the reported developer. The reported queue phase is TC2. Proposed COD is 2024-12-31.
- Queue ID
- PJM-AH1-251
- Location
- Spotsylvania, Virginia
- Technology
- Battery
- Developer
- Tavern Energy, LLC
- Market / region
- PJM
- Point of interconnection
- Todds Tavern- Spotsylvania/Goldsdale 115kV
What stands out
1
Tavern Energy LLC is a 50 MW Battery project in Virginia with status active.
2
Tavern Energy, LLC is the reported developer.
3
The reported queue phase is TC2; proposed COD is 2024-12-31.
Market and operating context
- Queue date
- 2025-02-18
- Proposed COD
- 2024-12-31
- IA status
- System Impact Study
- Study phase
- TC2
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.