Briefing on Tarim BESS

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Tarim BESS is a 201 MW Battery project in Texas, currently active.

BRP Tarim BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-25INR0491
Location
Karnes, Texas
Technology
Battery
Developer
BRP Tarim BESS LLC
Market / region
ERCOT
Point of interconnection
5727 Pawnee Switching Substation 138kV

What stands out

1

Tarim BESS is a 201 MW Battery project in Texas with status active.

2

BRP Tarim BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

Market and operating context

Queue date
2024-11-19
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tarim BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0491
LocationKarnes, Texas
TechnologyBattery
DeveloperBRP Tarim BESS LLC
Market / regionERCOT
Point of interconnection5727 Pawnee Switching Substation 138kV
Queue date2024-11-19
Proposed COD2027-12-01