Query
Tangelo
Type
Entity Briefing
Entity
Tangelo
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on Tangelo

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

75 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Tangelo is a 75 MW Solar Photovoltaic asset in Florida, currently Under construction.

Tangelo is reported in Florida under NextEra Energy. Available operating and financial measures include $1543/kW reported CapEx.

Location
Okeechobee, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
68828

What stands out

1

Tangelo is a 75 MW Solar Photovoltaic asset in Florida with status Under construction.

2

Available financial measures include $1543/kW CapEx.

3

Latest linked story: “NextEra Energy (NYSE: NEE) promotes Scott Bores to FPL president as Pimentel stays CEO” (Stock Titan, 2025-12-01).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#83 of 237
National rank
#1227 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Tangelo — verified asset snapshot

FieldValue
LocationOkeechobee, Florida
TechnologySolar Photovoltaic
Owner / parentNextEra Energy
OperatorFlorida Power & Light Co
GridFlorida Power & Light Company
Plant ID68828
Balancing authorityFlorida Power & Light Company
NERC regionSERC