Query
Tall Saddle Solar
Type
Entity Briefing
Entity
Tall Saddle Solar
Generated
2026-10-06T20:40:28.977Z

Briefing on Tall Saddle Solar

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
252 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-10-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Tall Saddle Solar is a 252 MW Solar project in Texas, currently active.

Tall Saddle Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-10-15.

Queue ID
ERCOT-27INR0309
Location
Kenedy, Texas
Technology
Solar
Developer
Tall Saddle Solar, LLC
Market / region
ERCOT
Point of interconnection
80076 AJO SUBSTATION 345kV

What stands out

1

Tall Saddle Solar is a 252 MW Solar project in Texas with status active.

2

Tall Saddle Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-10-15.

Market and operating context

Queue date
2024-07-01
Proposed COD
2029-10-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tall Saddle Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0309
LocationKenedy, Texas
TechnologySolar
DeveloperTall Saddle Solar, LLC
Market / regionERCOT
Point of interconnection80076 AJO SUBSTATION 345kV
Queue date2024-07-01
Proposed COD2029-10-15