Eagle Pines Gas is a 1.2 GW Gas project in Texas, currently active.
FGE Power is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-30.
- Queue ID
- ERCOT-18INR0009
- Location
- Cherokee, Texas
- Technology
- Gas
- Developer
- FGE Power
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 3109 Stryker - 3123 Trinidad
What stands out
Eagle Pines Gas is a 1.2 GW Gas project in Texas with status active.
FGE Power is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-10-30.
Latest linked story: “Vistra, ENGIE and other developers move to tap $5B Texas Energy Fund for 41 GW of gas-fired projects” (Utility Dive, 2024-06-03).
Market and operating context
- Queue date
- 2015-03-30
- Proposed COD
- 2028-10-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.