Briefing/owner7 operating assets · 1 queue projects
Swift Current Energy includes 1.8 GW of operating capacity and 402 MW of proposed queue capacity in the current result.
7 operating plants span 5 states. The linked queue contains 1 projects totaling 402 MW. Solar is the largest operating technology group at 1.4 GW.
- Coverage
- 7 plants across 5 states
- Largest asset
- Double Back Diamond · 593 MW
- Leading technology
- Solar · 1.4 GW
- Queue pipeline
- 1 projects · 402 MW
What stands out
1
7 operating plants total 1.8 GW across 5 states.
2
Solar is the largest operating technology group at 1.4 GW across 5 plants.
3
Double Back Diamond is the largest returned operating asset at 593 MW.
4
1 queue projects total 402 MW of proposed capacity.
Market and operating context
- Largest state footprint
- Illinois · 764 MW
- Technology concentration
- Solar represents 1.4 GW
- Development pipeline
- 1 projects · 402 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.