Swift Air Solar II is a 100 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.
Swift Air Solar II is reported in Texas since 2025 under Origis Energy USA, Inc. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Ector, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Origis Energy USA, Inc
- Operator
- Origis Energy USA, Inc
- Grid
- ERCOT (Texas)
- Plant ID
- 68587
What stands out
Swift Air Solar II is a 100 MW Solar Photovoltaic asset in Texas with status Operating.
Available financial measures include $1543/kW CapEx.
Latest linked story: “Origis plugs in final phase of 500-MW Swift Air solar complex in Texas” (Renewables Now, 2026-02-28).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #260 of 378
- National rank
- #885 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.