Briefing/projectactive
Sweetwater 5 Repower is a 79 MW Wind project in Texas, currently active.
Sweetwater Wind 5 LLC is the reported developer. Proposed COD is 2029-02-01.
- Queue ID
- ERCOT-28INR0504
- Location
- Nolan, Texas
- Technology
- Wind
- Developer
- Sweetwater Wind 5 LLC
- Market / region
- ERCOT
- Point of interconnection
- Bitter Creek Substation
What stands out
1
Sweetwater 5 Repower is a 79 MW Wind project in Texas with status active.
2
Sweetwater Wind 5 LLC is the reported developer.
3
proposed COD is 2029-02-01.
Market and operating context
- Queue date
- 2026-04-22
- Proposed COD
- 2029-02-01
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.