Source dates used by this summary were not recorded.

75 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Sweet Sue Solar is a 75 MW Solar Photovoltaic asset in PJM Interconnection, currently Under construction.

Sweet Sue Solar is reported in Virginia under Invenergy. Available operating and financial measures include $1543/kW reported CapEx.

Location
King William, Virginia
Technology
Solar Photovoltaic
Owner / parent
Invenergy
Operator
Invenergy Services LLC
Grid
PJM Interconnection
Plant ID
69474

What stands out

1

Sweet Sue Solar is a 75 MW Solar Photovoltaic asset in Virginia with status Under construction.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 74 MW of proposed capacity.

4

Latest linked story: “Solar farm projects moving forward in rural Virginia” (Daily Press, 2022-05-04).

Market and operating context

ISO / market
PJM Interconnection
State rank
#48 of 176
National rank
#1104 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Sweet Sue Solar — verified asset snapshot

FieldValue
LocationKing William, Virginia
TechnologySolar Photovoltaic
Owner / parentInvenergy
OperatorInvenergy Services LLC
GridPJM Interconnection
Plant ID69474
ISO / marketPJM Interconnection
State rank#48 of 176