Query
Swamp Cabbage
Type
Entity Briefing
Entity
Swamp Cabbage
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Swamp Cabbage

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

75 MW
Capacity
Operating
Current status
2026
Operating since
1
Generators
Briefing/plantOperating

Swamp Cabbage is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

Swamp Cabbage is reported in Florida since 2026 under NextEra Energy. Available operating and financial measures include $1543/kW reported CapEx.

Location
Hendry, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
68276

What stands out

1

Swamp Cabbage is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

Latest linked story: “NextEra-Dominion Energy: Scaling Up The Eastern U.S. To Match Demand” (Seeking Alpha, 2026-05-17).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#98 of 237
National rank
#1131 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Swamp Cabbage — verified asset snapshot

FieldValue
LocationHendry, Florida
TechnologySolar Photovoltaic
Owner / parentNextEra Energy
OperatorFlorida Power & Light Co
GridFlorida Power & Light Company
Plant ID68276
Balancing authorityFlorida Power & Light Company
NERC regionSERC