Query
Swamp Cabbage
Type
Entity Briefing
Entity
Swamp Cabbage
Generated
2026-10-09T03:10:17.737Z

Briefing on Swamp Cabbage

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
75 MW
Capacity
Operating
Current status
2026
Operating since
1
Generators
Briefing/plantOperating

Swamp Cabbage is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

Swamp Cabbage is reported in Florida since 2026 under NextEra Energy. Available operating and financial measures include $1543/kW reported CapEx.

Location
Hendry, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
68276

What stands out

1

Swamp Cabbage is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

Latest linked story: “NextEra-Dominion Energy: Scaling Up The Eastern U.S. To Match Demand” (Seeking Alpha, 2026-05-17).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#98 of 237
National rank
#1131 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Swamp Cabbage — verified asset snapshot

FieldValue
LocationHendry, Florida
TechnologySolar Photovoltaic
Owner / parentNextEra Energy
OperatorFlorida Power & Light Co
GridFlorida Power & Light Company
Plant ID68276
Balancing authorityFlorida Power & Light Company
NERC regionSERC